Larsen ES Kitchen Hood Replacement #25-26-12

Project consists of the removal and replacement of the existing kitchen hood and associated mechanical systems to meet current code, safety, and operational requirements

Status

Accepting Bids

Prebid Date 2/11/26 3:00pm
Bid Date 2/27/26 2:00pm

Company & Contacts

Hueneme Elementary School District
David Ragsdale  
805-488-3588 ext. 9801

Location

550 Thomas Ave, Oxnard, CA 93033

Project Contacts:

Balfour Beatty Construction

  • Rafael Alamillo

  • Senior Project Manager

  • Tel: 805.208.7462

  • 300 East Esplanade Drive
    Suite 1220
    Oxnard, CA 93036

Balfour Beatty Construction

  • Dennis Kuykendall

  • Construction Manager

  • Tel: 805-982-1558

  • 300 East Esplanade Drive
    Suite 1220
    Oxnard, CA 93036

Balfour Beatty Construction

  • Filbert Carbajal

  • Tel: 805-983-1553

  • 300 East Esplanade Drive
    Suite 1220
    Oxnard, CA 93036

Hueneme Elementary School District

  • David Ragsdale

  • 805-488-3588 ext. 9801

  • 205 North Ventura Road
    Port Hueneme, CA 93041

Flewelling & Moody

  • Jun Tanaka, AIA

  • t. 323-543-8300

  • t. 323-543-8322 (Direct)

  • 99 S. Lake Ave., Suite 300

  • Pasadena, CA  91101