VENTURA HARBOR VILLAGE - 1575 SPINNAKER REMODEL AND ADDITION

The work consists of site and building improvements: 1. Site Improvements – the front and back patios at 1575 Spinnaker will be demolished and re-built, with new retaining walls, stairs, railings, steel patio covers, site furnishings, lighting, landscaping, and fencing / 2. Building improvements / additions – a new entry tower, building addition, and roof deck will be added to the Marina side of 1575 Spinnaker; the central section of the building will be demolished and rebuilt; new steel moment frames will be erected on micropiles; new storefront and multi-fold doors will be installed; the exterior will be partially re-clad in wood; sections of tile roofing will be replaced with copper roofing; the interior will be remodeled as shell space for future restaurant tenants.
GEOTECH REPORT (click to expand/collapse)
RFI 001 / ASBESTOS REPORT (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
1575 Asbestos Report 134.4 KB
Pre Bid RFI#01 1575 Spinnaker Remodel 789.8 KB
SPECIFICATIONS (click to expand/collapse)
Staples RFI #2053-02 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
RESPONSE 9.30.25 KCI RFI #1_Harbor Village_9.29.25_TVN 1.0 MB