VENTURA HARBOR VILLAGE - 1575 SPINNAKER REMODEL AND ADDITION
The work consists of site and building improvements: 1. Site Improvements – the front and back patios at 1575 Spinnaker will be demolished and re-built, with new retaining walls, stairs, railings, steel patio covers, site furnishings, lighting, landscaping, and fencing / 2. Building improvements / additions – a new entry tower, building addition, and roof deck will be added to the Marina side of 1575 Spinnaker; the central section of the building will be demolished and rebuilt; new steel moment frames will be erected on micropiles; new storefront and multi-fold doors will be installed; the exterior will be partially re-clad in wood; sections of tile roofing will be replaced with copper roofing; the interior will be remodeled as shell space for future restaurant tenants.
GEOTECH REPORT
(click to expand/collapse)

Name | Size | ||
Earth Systems micropiles 306964-001_Addendum_to_GER_4-14-25 | 3.1 MB |
RFI 001 / ASBESTOS REPORT
(click to expand/collapse)

Name | Size | ||
1575 Asbestos Report | 134.4 KB | ||
Pre Bid RFI#01 1575 Spinnaker Remodel | 789.8 KB |
SPECIFICATIONS
(click to expand/collapse)

Name | Size | ||
1575 SPINNAKER REMODEL BID PACKET | 11.9 MB |
Staples RFI #2053-02
(click to expand/collapse)

Name | Size | ||
RESPONSE 9.30.25 KCI RFI #1_Harbor Village_9.29.25_TVN | 1.0 MB |